Work is in the home stretch at the Headhouse & Shambles! The cupola has been fully repaired and repainted, clock faces have been installed on both sides, and the clock is expected to be installed within the next week. Inside the Shambles, the plaster ceiling has been cleaned, and repointing is underway on all brick piers.
